The Gelder Group were entrusted with the replacement of the canopy to the floral tribute area at Lincoln Crematorium.

The steel framed canopy and roof were purpose designed to suite the existing access and arrangements of the Crematorium.

Safety for the public was a high priority for all involved throughout the delivery of the works.

The project was completed in a caring manner taking into account the sensitive location. Works were programmed to be delivered to ensure that the disruption to the normal activities were kept to an absolute minimum.

Replacement brickwork and decorative trellising were provided to enable the ivy and planting to be reinstated.

The majority of the works were completed in a protected zone out of normal working hours.